16312 / Trivandrum Kochuveli Shri Ganganagar Weekly Express

Train Type: Mail Express
Kochuveli to Shri Ganganagar | KCVL - SGNR Trains
Schedule: Saturday
Classes: GEN, SL, 3A, 2A
Trivandrum Kochuveli [KCVL] Origin
Run Time
Show all Stops
Shri Ganganagar Junction [SGNR] Destination
Distance
3021 Kms
Stops
46
Avg. Speed
52 kmph

Notifications

  1. Stoppage It has been decided to provide a stoppage to Train no. 16312, Kochuveli - Sri Ganganagar Express at Falna station for a period of six months with effect from 10-04-2023. [1]
  2. AugmentationOfCoaches decision has been made to revise the composition of Train no. 16312, as 2 Tier AC - 02 Coaches 3 Tier AC - 05 Coaches Economy 3 Tier AC – 03 Coaches Sleeper - 06 Coaches General - 03 Coaches Pantry Car - 01 Generator Car - 02 with effect from 25-11-2023. [2]
  3. Stoppage For the convenience of passengers, Railway has been decided to provide stoppage to Train no. 16312, Kochuveli - Sri Ganganagar Express at Lalgarh station from 30-09-2023. [3]

Timetable

# Station Arrival Departure Halt Schedule
1. Trivandrum Kochuveli KCVL Origin 03:45 pm NA Sa
2. Kollam Junction QLN 04:42 pm 04:45 pm 3 min Sa
3. Kayamkulam Junction KYJ 05:19 pm 05:21 pm 2 min Sa
4. Chengannur CNGR 05:38 pm 05:40 pm 2 min Sa
5. Tiruvalla TRVL 05:49 pm 05:50 pm 1 min Sa
6. Kottayam KTYM 06:30 pm 06:33 pm 3 min Sa
7. Ernakulam Town ERN 08:15 pm 08:20 pm 5 min Sa
8. Aluva AWY 08:45 pm 08:47 pm 2 min Sa
9. Thrissur TCR 09:45 pm 09:48 pm 3 min Sa
10. Shoranur Junction SRR 10:40 pm 10:45 pm 5 min Sa
11. Tirur TIR 11:28 pm 11:30 pm 2 min Sa
12. Kozhikode Main CLT 12:12 am Day 2 12:15 am 3 min Su
13. Kannur Main CAN 01:37 am 01:40 am 3 min Su
14. Kasaragod KGQ 02:48 am 02:50 am 2 min Su
15. Mangaluru Junction MAJN 04:05 am 04:10 am 5 min Su
16. Udupi UD 05:50 am 05:52 am 2 min Su
17. Kundapura KUDA 06:18 am 06:20 am 2 min Su
18. Mookambika Road Byndoor BYNR 07:03 am 07:05 am 2 min Su
19. Murdeshwar MRDW 07:34 am 07:36 am 2 min Su
20. Kumta KT 08:30 am 08:32 am 2 min Su
21. Madgaon Junction MAO 10:50 am 11:00 am 10 min Su
22. Thivim THVM 11:48 am 11:50 am 2 min Su
23. Kudal KUDL 12:24 pm 12:26 pm 2 min Su
24. Ratnagiri RN 03:50 pm 03:55 pm 5 min Su
25. Mangaon MNI 07:00 pm 07:02 pm 2 min Su
26. Panvel Junction PNVL 09:15 pm 09:20 pm 5 min Su
27. Vasai Road BSR 11:00 pm 11:10 pm 10 min Su
28. Boisar BOR 11:47 pm 11:49 pm 2 min Su
29. Vapi VAPI 12:30 am Day 3 12:32 am 2 min Mo
30. Surat ST 02:42 am 02:50 am 8 min Mo
31. Ankleshwar Junction AKV 03:24 am 03:26 am 2 min Mo
32. Vadodara Junction BRC 04:25 am 04:35 am 10 min Mo
33. Ahmedabad Junction ADI 06:40 am 06:50 am 10 min Mo
34. Palanpur Junction PNU 10:35 am 10:37 am 2 min Mo
35. Abu Road ABR 11:20 am 11:30 am 10 min Mo
36. Falna FA 12:39 pm 12:41 pm 2 min Mo
37. Marwar Junction MJ 01:40 pm 01:45 pm 5 min Mo
38. Pali Marwar PMY 02:08 pm 02:13 pm 5 min Mo
39. Jodhpur Junction JU 03:15 pm 03:30 pm 15 min Mo
40. Merta Road Junction MTD 04:58 pm 05:03 pm 5 min Mo
41. Nagaur NGO 05:55 pm 06:00 pm 5 min Mo
42. Nokha NOK 06:40 pm 06:42 pm 2 min Mo
43. Bikaner Junction BKN 08:10 pm 08:30 pm 20 min Mo
44. Suratgarh Junction SOG 11:25 pm 11:30 pm 5 min Mo
45. Rai Singh Nagar RSNR 12:19 am Day 4 12:21 am 2 min Tu
46. Shri Karanpur SRW 12:47 am 12:49 am 2 min Tu
47. Shri Ganganagar Junction SGNR 02:05 am On Day 4 Destination NA Tu

Route Map

Similar Trains

Enter station name / station code to find trains between stations

Enter train name / train number for train details

Enter station code or name for station details

More Trains

Notifications

  1. Train no. 16311/16312, Shri Ganganagar – Kochuveli – Shri Ganganagar Weekly Express will be provided experimental stoppage at Lalgarh Station. Ex. Shri Ganganagar from 26-09-2023 and Ex. Kochuveli from 30-09-2023. [4]
  2. Following the introduction of Vande Bharat Express, the timings of Train no. 16312 Kochuveli – Shri Ganganagar Express have been revised as Palanpur (10.35/10.37), Abu Road (11.20/11.30), Falna (12.39/12.41) and Marwar (13.40/13.45) with effect from 08-07-2023. [5]
  3. Due to non interlocking work, Train no. 16312, Kochuveli - Shri Ganganagar Express, journey commencing on 04-03-2023 will be diverted via Panvel – Kalyan – Khandwa – Itarsi – Bhopal - Sant Hirdaram Nagar – Nagda – Ratlam - Chhayapuri. [6]
  4. Due to upgradation work, Train no. 16312, Kochuveli - Sri Ganganagar Express commencing journey on 11-02-2023, 18-02-2023 and 25-02-2023 will be regulated for 15 minutes at Mangaluru Junction. [7]
  5. Due to maintenance works, Train no. 16312, Kochuveli – Shri Ganganagar Weekly Express scheduled to leave Kochuveli at 15.45 hrs o­n 03-12-2022 is rescheduled to leave at 17.10 hrs. [8]
  6. Train no. 16312, Kochuveli - Sri Ganganagar Express journey commences on 19/11/2022 is rescheduled by 90 mins. [9]
  7. Train no. 16312, Kochuveli - Sri Ganganagar Express journey commences on 26/11/2022 is rescheduled by 90 mins. [10]
  8. Train no. 16312, Kochuveli - Sri Ganganagar Express journey commences on 03/12/2022 is rescheduled by 85 mins [11]

References

  • Experimental stoppage for trains
  • Change in composition of coaches
  • Additional stoppage
  • Additional stoppage
  • Revised Timings of Train
  • Diversion due to non interlocking work
  • Regulation due to upgradation work
  • Rescheduling due to maintenance works in Kochuveli Yard
  • Line Block and Power Block at Kochuveli Yard in connection with Yard remodelling
  • Line Block and Power Block at Kochuveli Yard in connection with Yard remodelling
  • Line Block and Power Block at Kochuveli Yard in connection with Yard remodelling